Toward An Event Driven Scrum Process

with 10 comments

Recent posts in this blog and elsewhere recommended using technical debt (TD) criteria as an integral part of the build process. One could fail the build under conditions such as:

  • TD(current build) > TD(previous build)
  • TD per line of code > $1
  • TD as % of cost  > 50%
  • Many others…

If you follow this recommendation while integrating continuously, chances are some fixing might need to be done multiple times a day. This being the case, the relationship between the daily stand-up meeting and the build fail event needs to be examined. If the team anyway re-groups whenever the build fails, what is the value add of the daily stand-up meeting?

Figure 1 below, taken from Agile Software Development with Scrum, examines the feedback loop of Scrum from a process control perspective. It shows the daily stand-up meeting providing the process control function.

Figure 1: Process Control View of Scrum

Figure 2 below shows the feedback loop being driven by the build process instead of by the daily stand-up meeting. From a process control standpoint it is essentially identical to Figure 1. Control through the regularly scheduled daily stand-up meeting has simply been replaced by event-driven control. The team re-groups whenever the build fails.

Figure 2: Build Driven Process Control

Some groups, e.g. the Scrum/Kanban teams under Erik Huddleston and Stephen Chin at Inovis have been practicing Event Driven Scrum for some time now. A lot more data is needed in order to validate the premise that Event Driven Scrum is indeed an improvement over vanilla Scrum. Until the necessary data is collected and examined, two intuitive observations are worth mentioning:

  1. Event Driven Scrum preserves the nature of Scrum as an empirical process.
  2. A control unit that is triggered by events (build fail) is in the very spirit of adaptive Agile methods.